A carbon reduction plan template is the standard format UK central government asks suppliers to use under Procurement Policy Note 006. It sets out your net zero commitment, baseline and current emissions for Scopes 1, 2 and five Scope 3 categories, reduction targets, completed and planned measures, and a director’s sign-off, published on your UK website.
The Cabinet Office added the official template to the PPN 006 collection on 17 April 2025. It fits on a few pages, but the details matter: the wrong Scope 3 categories, a missing baseline note or an unsigned declaration can all cause problems at the condition of participation stage. This guide fills in each section with a worked example.
When do you need a carbon reduction plan?
PPN 006 applies to relevant procurements advertised on or after 24 February 2025, when the Procurement Act 2023 regime began. In-scope buyers are central government departments, their executive agencies and non-departmental public bodies. The measure covers contracts for goods, services or works with an estimated value above £5 million a year (including VAT), where it is relevant and proportionate.
Procurements started before 24 February 2025 continue under the earlier PPN 06/21. Our guide to carbon reduction plans for government contracts covers eligibility and evaluation in detail. This article concentrates on completing the template itself.
What sections does the carbon reduction plan template contain?

The official template has seven parts:
- Supplier name and publication date
- Commitment to achieving net zero
- Baseline emissions footprint
- Current emissions reporting
- Emissions reduction targets
- Carbon reduction projects (completed and future)
- Declaration and sign-off
The template sits alongside the PPN 006 technical standard, which sets the reporting rules. Read both together.
How do you complete each section?
The figures below are for a hypothetical facilities services company. They illustrate the method only.
1. Supplier name and publication date
Use the legal name of the bidding entity. The plan should be specific to that entity. A parent company’s plan can be used only if strict conditions are met: the bidder is wholly owned, the parent’s net zero commitment explicitly applies to the bidder, the measures can be applied by the bidder on the contract, and the plan is published on the bidder’s website. The template notes this may be only a temporary measure.
2. Commitment to achieving net zero
The template wording is: “[Supplier name] is committed to achieving net zero emissions by 20XX.” The technical standard requires a commitment to net zero by 2050 at the latest for UK operations. An earlier year is fine if you have a credible plan for it.
3. Baseline emissions footprint
State the baseline year, then Scope 1, Scope 2, Scope 3 (included sources) and the total in tCO2e. If you have never measured emissions before, the template’s guidance notes say to state this and use your first reporting period as the baseline.
Use the “additional details” box to explain anything unusual, for example a historic baseline without Scope 3, or a rebased year after a restructure.
4. Current emissions reporting
Report the same headings for the most recent reporting year. The technical standard says the plan should be reviewed and updated within six months of your financial year-end.
5. Emissions reduction targets
The template sentence is: “We project that carbon emissions will decrease over the next five years to XX tCO2e by 20XX. This is a reduction of XX%.” State clearly what the percentage is measured against, normally the baseline.
6. Carbon reduction projects
Completed initiatives: describe measures implemented since the baseline, and the tCO2e and percentage reduction achieved. The template says these measures must be in effect when performing the contract. Future initiatives: list planned measures. The guidance notes say both are for information.
7. Declaration and sign-off
The declaration confirms the plan follows PPN 006, the technical standard, the GHG Protocol Corporate Standard and the Scope 3 Standard, and uses the UK government conversion factors. The technical standard says a director (or equivalent, or a designated member for LLPs) must sign, with name, job title and date, and the plan must state when board approval was given.
What does a completed example look like?
Baseline year: 2024. Electricity was 200,000 kWh, converted with the DESNZ 2024 factor of 0.20705 kg CO2e/kWh.
| Emissions | Baseline 2024 (tCO2e) | Reporting year 2025 (tCO2e) |
|---|---|---|
| Scope 1 | 85.00 | 78.00 |
| Scope 2 | 41.41 | 35.40 |
| Scope 3 (Categories 4, 5, 6, 7, 9) | 160.00 | 152.00 |
| Total | 286.41 | 265.40 |
- Scope 2 baseline: 200,000 × 0.20705 = 41,410 kg = 41.41 tCO2e.
- Scope 2 in 2025, same consumption: 200,000 × 0.17700 = 35,400 kg = 35.40 tCO2e.
- Total reduction: 286.41 − 265.40 = 21.01 tCO2e, or 21.01 ÷ 286.41 = 7.3%.
Here is the catch. Electricity use did not change. The 6.01 tCO2e fall in Scope 2, about 29% of the total reduction, comes entirely from the cleaner grid factor. You can still report it, because the standard requires the government factors, but say so in the narrative. Claiming it as the result of your own measures would mislead evaluators. Our guide to the https://auditmycarbon.com/uk-government-ghg-conversion-factors-2025/ explains how the factors changed.
Target: “We project that carbon emissions will decrease over the next five years to 190 tCO2e by 2030. This is a reduction of 33.7% against our 2024 baseline.” (1 − 190 ÷ 286.41 = 33.7%.)
Which Scope 3 categories must the template include?
The technical standard requires all Scope 1 and 2 emissions plus five Scope 3 categories:
- Category 4: Upstream transportation and distribution
- Category 5: Waste generated in operations
- Category 6: Business travel
- Category 7: Employee commuting
- Category 9: Downstream transportation and distribution
Purchased goods and services (Category 1) is not required, even though it is often the largest category. You may report more, but keep the required subset clearly identifiable. Our explainer on https://auditmycarbon.com/scope-3-emissions-categories/ defines each one.
What mistakes cause carbon reduction plans to fail?
From the requirements in PPN 006 and the technical standard, these are the issues to check before you submit:
- Missing required categories. All five Scope 3 categories must be reported alongside Scopes 1 and 2.
- Wrong conversion factors. Emissions must be in tCO2e using the UK government’s published factors.
- No sign-off details. The signatory’s name, job title and date, plus the date of board approval, must appear.
- Not published properly. Suppliers should publish the latest plan on their UK website, linked prominently from the homepage, and keep previous plans online. Suppliers without a website must provide a copy on request within 30 days.
- Out of date. The plan should be refreshed within six months of financial year-end and at least annually.
- Mixed reporting periods. Use one consistent reporting period throughout.
- Inconsistent boundary. Use one of the GHG Protocol approaches, financial control, operational control or equity share, and stick to it.
How do you get the numbers for the template?
Scopes 1 and 2 come from gas, electricity and fuel records. The five Scope 3 categories need data on freight, waste, travel and commuting, often through staff surveys and supplier information. Our business carbon footprint calculator gives a first estimate. If a bid deadline is close and you need a plan that meets the technical standard, you can book a carbon audit and we will prepare the footprint and template with you.
FAQ
Where can I download the official carbon reduction plan template?
The Cabinet Office publishes it as an ODT file in the PPN 006 collection on GOV.UK. It was added on 17 April 2025, alongside the technical standard and guidance.
Does a carbon reduction plan have to say net zero by 2050?
It must commit to net zero by 2050 at the latest for UK operations. You can state an earlier year if you have a credible plan to achieve it.
Who has to sign the carbon reduction plan?
A director, or equivalent senior leader, or a designated member for an LLP. The plan must show their name, job title and date, and confirm when the board approved it.
Can I use my parent company’s carbon reduction plan?
Only if the bidder is wholly owned, the parent’s commitment is stated to apply to the bidder, the measures can be applied by the bidder on the contract, and the plan is published on the bidder’s website. The template says this may be a temporary measure only.
How often should I update my carbon reduction plan?
At least annually. The technical standard says it should be reviewed and updated within six months of your financial year-end.
Sources
- >PPN 006: Taking account of Carbon Reduction Plans in the procurement of major government contracts, Cabinet Office (GOV.UK)
- >PPN 006 technical standard for completion of carbon reduction plans (GOV.UK)
- PPN 006 Carbon Reduction Plan template (ODT), added 17 April 2025 (GOV.UK)
- >GHG Protocol Corporate Standard
- Greenhouse gas reporting: conversion factors 2024 and 2025, DESNZ (GOV.UK)